Steps to create a coal load for an open-top freight wagon. It takes around 10 minutes per wagon but could be reduced if done in batches. Steps:
Month: January 2026
Forest area base and ballast
Preparation of the forest was done by cutting a wood to shame and gluing brown and light brown dirt. Ballasting was done as always but with different ballast from Noch. White dots represent placement for trees.

