Skip to content

Maqueta Trens

Contruccions per un afficionat

Menu
  • Scenery
  • Electronics
  • Compact automated H0 model train
  • Quant a
Menu

Scenery

  • Coal load for freight wagon

    Coal load for freight wagon

    Steps to create a coal load for an open-top freight wagon. It takes around 10 minutes per wagon but could be reduced if done in batches. Steps:

  • Forest area base and ballast

    Forest area base and ballast

    Preparation of the forest was done by cutting a wood to shame and gluing brown and light brown dirt. Ballasting was done as always but with different ballast from Noch. White dots represent placement for trees.

  • DIY Trees for H0 scale

    DIY Trees for H0 scale

    I want to create a small forest in my layout. Trees are expensive and most of they feel like plastic. I decided to attempt to create a tree by using wire and rope. The process is straightforward but hard to master. I have tried different variations, in order from left to right: These attempts do…

Recent Posts

  • Coal load for freight wagon
  • Forest area base and ballast
  • DIY Trees for H0 scale
  • Improving the bridges
  • DIY Programming on siding track with Z21 Starter

Recent Comments

No comments to show.

Archives

  • January 2026
  • November 2025
  • October 2025
  • September 2025
  • December 2024
  • November 2024

Categories

  • Electronics
  • General
  • Model
  • Scenery
  • Wagon and lomotives
© 2026 Maqueta Trens | Powered by Superbs Personal Blog theme
EnglishEnglish
CatalàCatalà