Coal load for freight wagon
Steps to create a coal load for an open-top freight wagon. It takes around 10 minutes per wagon but could be reduced if done in batches. Steps:
-
Forest area base and ballast
Preparation of the forest was done by cutting a wood to shame and gluing brown and light brown dirt. Ballasting was done as always but with different ballast from Noch. White dots represent placement for trees.
-
Improving the bridges
The layout has two bridges. One in the back composed by NOCH-21320 and one in the front composed by NOCH-21320 + 2x NOCH-21350 and the piers from NOCH-21400. The original bridge was grey, which is a common colour seen in this kind of layouts, but I felt it looked as cheap plastic. I decided to…